Hoonigan Burnyard
Number of Pit Boxes: 12
Surface Types: 2 (Center concrete is slightly more grippy than the perlin looking pink/gray concrete)
UPDATE 1.3:
Changed out the electrical box for a tire as per their most recent update
Also extended the stands and change the model to look better and match the new stands they're using
Here is the first pass at the Hoonigan's new Burnyard.
It's missing a few details around the outside of the track. Once I find more time, I'll add them in. However, the inside of the yard is as accurate as Google Maps math can get it.
The Trailer
The trailer is cut and raised to the specs that were stated in one of the Daily Transmissions. Once they actually cut and raise it, I'll make it accurate to the measurements they use.
It comes with 4 layouts:
Daily Transmission
DT Single Ramp
DT Double Ramp
Burnyard Bash
Number of Pit Boxes: 12
Surface Types: 2 (Center concrete is slightly more grippy than the perlin looking pink/gray concrete)
UPDATE 1.3:
Changed out the electrical box for a tire as per their most recent update
Also extended the stands and change the model to look better and match the new stands they're using
Here is the first pass at the Hoonigan's new Burnyard.
It's missing a few details around the outside of the track. Once I find more time, I'll add them in. However, the inside of the yard is as accurate as Google Maps math can get it.
The Trailer
The trailer is cut and raised to the specs that were stated in one of the Daily Transmissions. Once they actually cut and raise it, I'll make it accurate to the measurements they use.
It comes with 4 layouts:
Daily Transmission
DT Single Ramp
DT Double Ramp
Burnyard Bash
That was my bad. I rotated the map to properly align the sun and apparently missed rotating the colliders